Overlooking St. Paul’s Cathedral and benefiting from panoramic views of the London skyline, the curved aspect of the 10th floor terrace area presented an interesting challenge. The angled cuts create more deck board wastage than usual, but with support from EnviroBuild this was allowed for and calculated before the works started, helping to manage costs and ensuring no delays.